5 分钟阅读

Designing a licensor approval workflow that does not lose anything

The approval gates most licences require, what to record at each round, and how to handle e-mail approvals.

本指南目前提供英文版。

The usual approval gates

Most licences require approval at three points: the concept or artwork, the pre-production (PP) sample, and the final production sample. Some also require packaging and marketing material. A product should not move past a gate without a recorded decision.

What to record at every round

Record the date submitted, the pictures or files sent, the decision (approved, approved with changes, changes required or rejected), the licensor's reference, the comments and the date decided. Changes required means a new round with new pictures.

Service levels and late alerts

Agree how long each department may wait for a licensor decision before chasing, and track waiting days. Late approvals should be visible to managers, not discovered at the end of the season.

E-mail approvals

Some licensors answer by e-mail instead of a portal. The e-mail is then the proof: keep the original e-mail (.eml or .msg), a PDF or a screenshot with the decision, together with sender, date and subject.

How LiceNTraK does it

LiceNTraK has a ten-stage workflow with three licensor approval gates. Each licence is set to portal, e-mail or both; e-mail approvals require the proof before the decision is saved, and an e-mail approvals register flags any decision without it.

← 全部资源

用您自己的合同和订单来看看

30 分钟完整流程在线演示。