The usual approval gates
Most licences require approval at three points: the concept or artwork, the pre-production (PP) sample, and the final production sample. Some also require packaging and marketing material. A product should not move past a gate without a recorded decision.
What to record at every round
Record the date submitted, the pictures or files sent, the decision (approved, approved with changes, changes required or rejected), the licensor's reference, the comments and the date decided. Changes required means a new round with new pictures.
Service levels and late alerts
Agree how long each department may wait for a licensor decision before chasing, and track waiting days. Late approvals should be visible to managers, not discovered at the end of the season.
E-mail approvals
Some licensors answer by e-mail instead of a portal. The e-mail is then the proof: keep the original e-mail (.eml or .msg), a PDF or a screenshot with the decision, together with sender, date and subject.
How LiceNTraK does it
LiceNTraK has a ten-stage workflow with three licensor approval gates. Each licence is set to portal, e-mail or both; e-mail approvals require the proof before the decision is saved, and an e-mail approvals register flags any decision without it.
How to prepare a royalty statement that survives an audit
What a licensor expects on a statement, where errors creep in, and how to make every line defensible.
Read the guide →5 min readMinimum guarantees: how to track them before it is too late
How a minimum guarantee works, why shortfalls are found late, and how to pace royalty against the contract calendar.
Read the guide →See it with your own contract and orders
A 30-minute live demonstration of the full flow.